WTOP Headquarters

GHT Limited 2019

WTOP radio station recently relocated to their Chevy Chase office, about a 10,000 SF increase from their previous DC location. GHT provided mechanical, electrical, and plumbing design services to accomadate the needs of the space. Due to the abundance of broadcasting and electrical equipment in the space, design services included, supplemental HVAC (24/7) for the LAN room, conference room, server room, and broadcast related rooms. GHT also designed a generator system and UPS system to support appropriate loads.

WTOP’s office space includes a mix of open plan work stations and enclosed private offices, server room, large and small conference rooms, and various recording studios as well as open plan seating for up to 50 people.

Location
Year Completed
Architect
Features
Services Provided
GHT Studio